Source article Tier B
4 Million Sq Ft Data Center Campus Proposed Outside Atlanta, Georgia
DataCenterDynamics, "4 million sq ft data center campus proposed outside Atlanta, Georgia," 2026.
Custody docket
- Record
- datacenterdynamics-hampton-technology-park-dri-2026
- Type
- article
- Trust tier
- B
- Status
- published
Sources are graded A (primary) / B (secondary academic) / C (secondary journalism) / D (tertiary or contested). See the manifesto’s Evidence Standard for full criteria.
Source for Hampton Technology Park’s scale (603 acres, 5 buildings, 4M sq ft), developer (Hampton Technology Park Owner LLC), the Development of Regional Impact filing with the Georgia Department of Community Affairs, and projected buildout through 2033.
Update, 2026-07-28 (receipt-gate): fetched directly via reader-proxy after two direct 403s; text confirms all figures verbatim, though DCD’s own language is conditional (“could total… could be built out”), softer than a flat declarative. Independently corroborated against the Georgia DCA DRI filing system directly (DRI ID 4624, developer “Hampton Technology Park Owner, LLC c/o Dillard Sellers,” status “Completed”). Note: AJC’s own March 2026 reporting on the same DRI ID states “604-acre” against this source’s 603 — a one-acre discrepancy, immaterial to any argument made from it, logged for the record.
Provenance
- Creator
- DataCenterDynamics
- Published
- 2026
- Accessed
- 2026-07-28