WORD REIMAGINED The wire · 35 filed · live

Source article Tier B

4 Million Sq Ft Data Center Campus Proposed Outside Atlanta, Georgia

DataCenterDynamics, "4 million sq ft data center campus proposed outside Atlanta, Georgia," 2026.

Custody docket

Record
datacenterdynamics-hampton-technology-park-dri-2026
Type
article
Trust tier
B
Status
published

Sources are graded A (primary) / B (secondary academic) / C (secondary journalism) / D (tertiary or contested). See the manifesto’s Evidence Standard for full criteria.

Source for Hampton Technology Park’s scale (603 acres, 5 buildings, 4M sq ft), developer (Hampton Technology Park Owner LLC), the Development of Regional Impact filing with the Georgia Department of Community Affairs, and projected buildout through 2033.

Update, 2026-07-28 (receipt-gate): fetched directly via reader-proxy after two direct 403s; text confirms all figures verbatim, though DCD’s own language is conditional (“could total… could be built out”), softer than a flat declarative. Independently corroborated against the Georgia DCA DRI filing system directly (DRI ID 4624, developer “Hampton Technology Park Owner, LLC c/o Dillard Sellers,” status “Completed”). Note: AJC’s own March 2026 reporting on the same DRI ID states “604-acre” against this source’s 603 — a one-acre discrepancy, immaterial to any argument made from it, logged for the record.

Provenance

Creator
DataCenterDynamics
Published
2026
Accessed
2026-07-28

Cited by

Theme custody

No theme record references this source.

On the wire